Once the first layer of wall vapor barrier is installed on the the top half of the wall then the 2nd layer is attached. The 2nd layer over laps the top layer so all the water behind the vapor barrier drains down to the floor waterproofing system. The CleanSPACE™ is mechanically fastened to the brick walls.