Pier Locations
Each pier is marked prior to installation in the footing trench. Also, each pier is checked vertically prior to installation. This lead section is a three flight, DISK, helical pier by design from an engineering firm. the smallest flight is first at the ground level. This photo shows the middle and the largest top flight of this helical pier.
Top Flight Lead Helical Installed
With the excavator supplying the power to drive the helical into the ground, the 3rd and largest flight is being torqued into the soil.
Engineered Depth
Each pier location has a specific depth that need to be reached. Once the lead flight is installed with the 3 sized disks, additional square shafts are attached and driven.
Square Shaft Sections
Attaching the second square shaft section without helical flights allows the excavator to apply the torque needed to reach the engineered depth per pier. Third and fourth sections also may be added as needed.
Row of Helical Pier Caps
Once each helical is installed, a flat pier cap is attached. Next, the re-bar is installed around the piers and then the concrete footing is poured.